After 30 days...

At last, we gave up and escaped to stay at Aeton Hotel since last Thursday night... will be staying up to this Friday...

Plaster ceiling:-
This was on Monday, almost last stage of plaster ceiling works.
 
At last, payment...
 
Toilet doors:-
Hubby was surveying for the PVC foldable perforated doors for toilet. Cheaper solution... :)
 

Was asking my bro-in-law for installation... but, I have to buy it first.
 

 Painting master bedroom:-
A stripes wall at last... How? Nice? :)

This is the 'Si Fu'
 

 Today, lights and fans installation at upstair...

Kid bedroom

Master bedroom... with 2 units of fan... bravo... "."

 Cleaning works in progress... boxes still here and there...

Thursday, August 30, 2012

Episode of Works Done by Indon...

1) Installing exchaust from toilet works in progress:-

Adjusting the exit unit

Installing the exit unit

Done the exit unit

Well, not really as per what I wish to, but nothing much i can do in fact... :(

Aiya.. just hope hubby don't make too much 'cake' there lah... =.='

3) Removing the cover at windows at roof and replacing by net to enable air ventilation... :) hopefully it can improves the air circulation at home... :)

In progress
 
Done
 

Ceiling Plaster Day 4

The episode is continuing at down stair....

Dry Kitchen

Wednesday, August 29, 2012

Finalling Cabinets Works

It was quite long time since the 1st time I got the quotation from Foong on the cabinets. It was since April-12...

Trying to finalise all the design... still pending mainly on TV cabinet, he promised to do as per what we wish to at last on today... waiting for it... he will again finalise it after he takes the final dimension after we complete the plaster ceiling works...

This morning, I tried to finalise the design for cabinet at upstair living hall... see some draft below:-

Drilling holes for exhaust fan and hood

Uh... started the exhaust and hood's holes drilling at last after waiting for so long...

4" hole drilling for exhaust fan from toilet -  toilet's smell gotto directed to outside as it is facing to kitchen and fridge... :(

Hole done
 
6" hole drilling for hood

Tuesday, August 28, 2012

Hotel Booking

Hubby went to book the Aeton Hotel today...


Ok, gonna 'campaign' for a while at there....

Plaster Ceiling - Day 2

Up stair living hall.

I drafted the arrangement as below for the reference of the plaster ceiling and electrical contractors as well as supervision by hubby:-

 
 
Scald folding at the staircase area:-




Manhole:-


Almost done, looks great :)


Monday, August 27, 2012

Plaster Ceiling

Arrival of tools and parts to start the ceiling plaster work on this morning:-

Scald foldings

Scald foldings


 Oh... installing the scald folding

 Installing the Flat Bar

 Oh... making dirty the whole floor... @.@"

Installing the Fan Hook

 Dismantling the Fan at Kid Bedroom 2

Flat bar been installed

Installing the Fan Hook
 

Surveying of Hotel for Temporary 'Escape'

As ceiling plaster works will be started by this week, hubby went to survey for hotel for temporary escape on last week.
 
He is checking the condition of nearby Aeton Hotel which was biult on last year. It is near to Pizza Hut, KFC, Secret Recipies and Weng Hub...
 
 
Double Bedroom is needed as we are FIVE... :)

Room rate... one week is the maximum, otherwise budget burst... :(

 So-so condition but ok lah...

 
Oh... washroom... 

Work Done up to Last Weekend

The progress on last week are mainly on electrical works... 
 
Relocation of plug in kids bedroom 1

Installation of cable in Kids bedroom 1

  Relocation of plug in kids bedroom 2
 
Installation of cable in Kids bedroom 2

Addition of plug in master bedroom

Installation of cable in Master bedroom

 
Upstair Family Hall
 
Relocation of plug at Kitchen

Thursday, August 23, 2012

House Renovation-New Speakers

This unit was recovered by brother sometime ago as a 'system barter' exchange for the money we lend for them to buy the van years ago...

Unit has been trial assembled as below photo shown. Hmm... it is now an exercise for my cabinet contractor to think about how to settle the TV cabinet design as we want to re-use back the old TV cabinet and this speaker...

House Renovation-Relocation of Air Conditioner

As per requested by plaster ceiling contractor, existing air cond. in the rooms have to be lowered down... it was quite a struggle decision as it incurred another cost. With the suggestion from electrical contractor, Wong, we managed to find this more reasonable contractor who charged RM 100 per air cond. relocation.
  
First room done
 

Second room in progress

House Renovation-Lighting Hunting

Went to V-World Lighting with hubby and found this cheap spot light (see the picture circle one). Good for master bedroom headboard. 
 
This photo was taken by hubby and email to me :) little bit surprise for his funny action...
 


Survey of Suitable Lighting at Altar Area
Found this lighting at Sushi King which we can direct the light to the wall area. I have to take the photo to show to the lighting shop as they could not find the one I found in Sushi King Nilai.

See below:-